Roadmap

Validation first. Scale second. Treasury throughout.

The sequence below follows the phasing set out in the Business Plan. Stages are marked as current, planned or future; timing is indicative and conditional on capital, partners and regulatory process.

  1. 01Current

    Formation & pre-seed

    Company formation, legal and brand foundations, and development of the pre-seed financing round described in the Business Plan.

  2. 02Planned

    E190 ACMI validation

    Four Embraer E190s operated under ACMI, anchored by VIP charter and a scheduled FBO-to-FBO network, to validate demand, build operational track record and generate live P&L.

  3. 03Planned

    B777 cargo + VVIP

    A 15-aircraft B777 fleet alongside six E190s: cargo-anchored intercontinental operations entered through ACMI wet-lease, with VVIP cabin routes engineered on top of the freight schedule and a progressive transition to own metal.

  4. 04Future

    Global aviation platform

    Expansion toward a global UHNWI fleet with ACMI partners covering non-EU markets, continuous testing of aircraft types, corridors and cargo verticals.

  5. 05Future

    FlightPass

    Issuance of the FlightPass utility layer from a separate ADGM entity, planned in the Business Plan to begin from Year 4 as an access and membership upgrade layer.

  6. 06Future

    Tokenized aviation ecosystem

    A compounding Bitcoin treasury alongside the operating platform, with board-authorized Bitcoin profit distributions contingent on board resolution.

Nothing beyond the current stage has commenced. Each stage is conditional on financing, counterparties and regulatory approval, and may change, be delayed or not occur.